English Language ▾
Home>Global Projects
Large Bulky Waste Shredding and Recycling Separation Solution in Chongqing

Large Bulky Waste Shredding and Recycling Separation Solution in Chongqing

Applicable Materials:

MSW, bulky waste, recyclable materials

Processing capacity:

10–60 t/d

Output size:

≤300–500 mm

Location:

China

Information of Large Bulky Waste Shredding and Recycling Separation Solution in Chongqing

Recently, a municipal solid waste transfer station project in Chongqing, China, equipped with a complete set of core equipment and system design provided by ZAECOTECH, has been successfully installed, commissioned, and officially put into operation.

Within a unified and well-planned facility layout, the project integrates both a bulky waste processing system and a recyclable waste sorting system. Through a modular system combination, it achieves a dual-purpose site with coordinated efficiency, making it a benchmark application of integrated municipal solid waste solutions in Southwest China.

As one of China’s first pilot cities for the “Zero-Waste City” initiative, Chongqing has set clear requirements for improving bulky waste dismantling facilities and enhancing resource recovery efficiency. From the early planning stage, this project was designed to simultaneously address bulky waste reduction and recyclable material recovery.

With mature equipment performance, extensive experience from multiple benchmark projects, and full-process service capability, ZAECOTECH’s modular integrated solution was ultimately selected for implementation.

Bulky Waste Processing System: Imported Hydraulic Drive for High-Efficiency Volume Reduction

The bulky waste processing system is an integrated solution consisting of a feed chain conveyor, an imported hydraulic-driven bulky waste shredder, a discharge belt conveyor, a self-cleaning magnetic separator, a pulse dust removal system, and an intelligent control system, covering the entire processing workflow.

The core shredder adopts an imported hydraulic system combined with constant power control technology, ensuring stable high-torque operation even when processing complex materials such as springs, solid wood, and metal frames. This significantly improves equipment reliability and extends service life.

After shredding, ferrous metals are efficiently separated and can be directly recovered for recycling. The remaining combustible materials are then co-processed with municipal solid waste in waste-to-energy incineration plants, achieving both volume reduction and resource recovery.

Recyclable Material Sorting System: Multi-Stage Purification for Higher Resource Recovery Value

The system is designed to handle multiple material types, including cardboard, mixed plastics, PET bottles, aluminum cans, and glass. It is optimized for facilities with a dual-level building structure and follows a streamlined processing layout.

Materials are discharged from the upper unloading port into a steel chain conveyor and pass through an 8-station manual sorting platform for initial classification. The remaining materials then enter a disc screen for size separation.

Large lightweight combustible materials are directly transported to collection vehicles, while smaller heavy materials undergo magnetic separation to recover ferrous metals before being discharged into storage bins for final transport.

This integrated process of manual pre-sorting + mechanical screening + magnetic separation purification significantly improves sorting accuracy and recycling value while effectively reducing labor intensity.

Related Projects