Wind Turbine Blade Shredding Project in Xinjiang

Applicable Materials:

Decommissioned wind turbine blades

Processing Capacity:

10,000 tons per year (t/a)

Commissioning:

Operational in 2025

Location:

China

Information of Wind Turbine Blade Shredding Project in Xinjiang

As a major region for wind power installed capacity in China, Xinjiang is witnessing its first peak of wind turbine decommissioning. To address the industry challenges of wind turbine blade composites, such as "toughness and difficulty in processing" and "low separation efficiency," ZAECOTECH Environmental Protection has tailored a full-process, automated pre-treatment solution: including core equipment such as wind turbine blade shredders, wind turbine blade crushers, wind turbine blade grinders, wind turbine blade molding equipment, and intelligent control systems. Through the integrated process of "Automatic Feeding — Graduated Crushing — Classified Sorting — Fine Grinding," it accurately separates glass fiber, resin, and balsa wood. The resource recovery rate is nearly 100%, truly matching the requirements of this benchmark project for high-value-added, large-scale, and harmless recycling of decommissioned wind turbine blades.

Ten-Thousand-Ton Class Waste Wind Turbine Blade Resource Recovery Project
Ten-Thousand-Ton Class Waste Wind Turbine Blade Resource Recovery Project
Ten-Thousand-Ton Class Waste Wind Turbine Blade Resource Recovery Project

Responding to national policies and supporting the solid progress of the Resource Recycling Industrial Park 

The National Development and Reform Commission (NDRC), in conjunction with multiple departments, issued the "Guiding Opinions on Promoting the Circular Utilization of Decommissioned Wind Power and Photovoltaic Equipment," clearly requiring the active construction of a wind power equipment circular utilization system covering standardized recovery, high-value utilization, and harmless disposal. Driven by this policy, the project’s annual processing capacity has reached 10,000 tons after being put into operation. The large-scale recycling and reuse of decommissioned wind turbine blades not only fills the gap in wind turbine blade resource treatment in the Xinjiang region, but also takes a highly exemplary step for the decommissioned circular utilization of wind turbine blades across the country.